Dear subscribers! Please pass metrics from the 1st to 5th of each month and in the case of gas smell, emergency call 104 If gas smell detects, call 104

Cost of services 2022 рік

 

To the attention of the heads of enterprises, organizations and the population of Ternopil Region – the natural gas consumers. 

We would like to inform you about the main costs of works of the PrJSC “Ternopilgaz”, put into operation on February 1, 2022 (the cost of works is indicated including VAT):

Service  

Category

Type of works

 

Cost of works

1. Development of technical conditions issued to the constructor for the design of construction projects:industrial purposesnew gas pipelines 

3477,00 UAH

new construction (connection to gas networks of objects of legal entities) 

2620,72 UAH

reconstruction of construction objects 

1790,42 UAH

communal and household purposesnew construction 

1660,68 UAH

reconstruction   

986,04 UAH

population

connection of objects of individuals to gas networks 

 

648,73 UAH

reconstruction

 

233,53 UAH

     
2. Execution of works on dismantling and installation of measuring equipment (hereinafter - ME) at the request of the customer (household consumer), and when interfering with the work of ME 

 

 

 

335,00 UAH

     
3. Execution of project approval works: external gas supply and its estimated part for individual houses and apartments of individuals 

544,62 UAH

external gas supply and its estimated part for communal facilities (legal entities) 

779,52 UAH

external gas supply and its estimated part for industrial facilities (legal entities) 

1008,91 UAH

gas supply and its estimated part during the construction of new gas distribution pipelines 

1791,87 UAH

internal gas supply and its estimated part in terms of the organization of the gas metering unit 

418,12 UAH

     
4. Execution of works on inspection and cleaning of smoke and ventilation ducts at the request of consumers (legal entities): initial check when connecting gas equipment with a capacity of up to 30 kW 

266,39 UAH

re-inspection when connecting gas equipment with a capacity of up to 30 kW 

197,62 UAH

initial check when connecting gas equipment with a capacity of 30 to 60 kW 

318,70 UAH

re-inspection when connecting gas equipment with a capacity of 30 to 60 kW  

229,85 UAH

initial check when connecting gas equipment with a capacity of more than 60 kW 

414,71 UAH

re-inspection when connecting gas equipment with a capacity of more than 60 kW 

286,84 UAH

initial inspection of smoke and ventilation ducts of multi-storey buildings  

342,24 UAH

re-inspection of smoke and ventilation ducts of multi-storey buildings 

234,02 UAH

5. Execution of works on inspection and cleaning of smoke and ventilation ducts at the request of consumers (population): initial check 234,61 UAH
re-inspection 157,42 UAH
cleaning of one smoke vent channelfrom rubble326,18 UAH
from soot241,58 UAH
     
   

Gas pipeline diameter (mm)

 
6. Execution of works on termination (restriction) and restoration of gas supply to the consumer’s facility termination (restriction) of gas supply to the consumer’s facility by closing the switching device and sealingup to 50

284,43 UAH

50-150365,88 UAH
more than 50469,26 UAH
restoration of gas supply to the consumer’s facility by opening the switching device and removing the sealup to 50

427,54 UAH

50-150485,52 UAH
more than 50641,00 UAH
termination (restriction) of gas supply to the consumer’s facility by closing the switching device with the installation of an inventory cap and sealingup to 50

452,26 UAH

50-150590,17 UAH
more than 50768,06 UAH
restoration of gas supply to the consumer’s facility by opening the switching device, dismantling the inventory cap and removing the sealup to 50

607,05 UAH

50-150706,72 UAH
more than 50988,81 UAH
termination of gas supply to a residential building (without installation of a plug)  

75,00 UAH

termination of gas supply to a residential building with the installation of a plug 

140,00 UAH

restoration of gas supply to a residential building 

117,76 UAH

     
7. Gas boiler maintenance (wall double-function)   

411,37 UAH

     

Repair and / or maintenance of gas-using equipment (boiler, convector, home pressure regulator) depends on the amount of work required during the repair. Their list is specified in the Delivery-Acceptance Certificate of works performed (services rendering) provided to the customer after performance of works.